
Warehouse & Logistics
Sinusoidal Joint Renovation
Fast. Precise. Durable.
Deutschland, Germany
Challenges
- High continuous loads from industrial trucks
- Tight time window without interrupting goods flow
- Precise height adjustment and abrasion resistance
Our Solution
Damaged areas were cut, chiselled out 20 mm, cleaned and pre-wetted; flanks primed with KORODUR PC. Joint field applied with Rapid Set MORTAR MIX DUR in paste consistency, smoothed and water-cured. Fully load-bearing after approx. 2 hours.
Image Gallery
Benefits
Minimal downtime: full load after approx. 2 h – logistics stays on track
Durable, wear-resistant joint repair with MORTAR MIX DUR
Clean, reproducible execution with KORODUR PC primer
Products Used
Technical data and standards of the KORODUR products used
Rapid Set MORTAR MIX DUR
Rapid mortar with integrated wear aggregate for joint repairs
Technical Data
Compressive strength (1 h)≥ 21 N/mm²
Compressive strength (24 h)≥ 42 N/mm²
Consistencypaste to plastic
Load-bearing afterapprox. 2 h
Standards & Certifications
ASTM C928DIN EN 1504-3
KORODUR PC
Primer for thin-layer screed systems
Technical Data
Pull-off resistance≥ 1.0 N/mm²
ApplicationFor NEODUR Level
Standards & Certifications
DIN EN 1504-4
More References

Warehouse & Logistics
Beach Chair Hall Sylt
2,200 m² fast & economical
Sylt, Germany|2.200 m²
NEODUR HE 65KORODUR HB 5 rapid

Warehouse & Logistics
Orchard Farm Ibbenbüren
Floor with character – no downtime
Ibbenbüren, Germany
KORODUR FSCem ScreedNEODUR HE 60 rapid

Warehouse & Logistics
DHL Loading Bridges
Fast. Safe. Strong.
Ottendorf-Okrilla, Germany
Rapid Set CEMENT ALLRapid Set MORTAR MIX
Ähnliches Projekt? Kontaktieren Sie unsere Berater.
Berater kontaktieren