Skip to content
Renovated loading bridges at DHL logistics centre
Warehouse & Logistics

DHL Loading Bridges

Fast. Safe. Strong.

Ottendorf-Okrilla, Germany

Challenges

  • Permanent mechanical stress from truck traffic
  • Endangerment of load-bearing capacity in high-frequency logistics operations
  • Very short closure time required

Our Solution

Damaged concrete areas were chiselled out, cleaned and filled with Rapid Set CEMENT ALL and MORTAR MIX. After just 4 hours, all loading bridges were fully operational again.

Image Gallery

Benefits

Extremely short downtime – clearance within 4 hours
Load-bearing capacity restored despite heavy continuous loads
Economical solution: targeted repair instead of large-scale demolition

Products Used

Technical data and standards of the KORODUR products used

Rapid Set CEMENT ALL

Universal rapid cement for spot repairs

Technical Data

Compressive strength (1 h)≥ 21 N/mm²
Compressive strength (24 h)≥ 42 N/mm²
Walkable afterapprox. 15 min
Fully load-bearing afterapprox. 1 h

Standards & Certifications

ASTM C928DIN EN 1504-3

Rapid Set MORTAR MIX

Rapid mortar for joints, reprofiling and profile installation

Technical Data

Compressive strength (1 h)≥ 21 N/mm²
Compressive strength (24 h)≥ 42 N/mm²
Consistencypaste to plastic
Load-bearing afterapprox. 1–2 h

Standards & Certifications

ASTM C928DIN EN 1504-3

Ähnliches Projekt? Kontaktieren Sie unsere Berater.

Berater kontaktieren