Skip to content
Beach chair hall on Sylt with new industrial floor
Warehouse & Logistics

Beach Chair Hall Sylt

2,200 m² fast & economical

Sylt, Germany2.200 m²

Challenges

  • Restoration within a time window of only approx. 4 months after fire damage
  • High demands on resistance to mechanical wear and weathering
  • Strong bond to substrate using suitable bonding agent
  • Economical application method (silo delivery / pumping technology)

Our Solution

Renovation with hard aggregate screed NEODUR HE 65. The wearing layer was installed on KORODUR HB 5 bonding agent using the KORODUR silo system with pumping and mixing technology, making the workflow extremely economical and sustainable.

Image Gallery

Benefits

Robust against use and weathering – long-lasting surface
Fast and efficient installation through silo technology
Secure, strong bond on hardened concrete substrate
Long-term operational safety and protection of beach chairs

Products Used

Technical data and standards of the KORODUR products used

NEODUR HE 65

Hard aggregate screed for indoor and outdoor use with silo technology

Technical Data

Compressive strength≥ 65 N/mm²
Abrasion resistanceA6 (≤ 6 cm³/50 cm²)
ApplicationSilo system / pump technology

Standards & Certifications

DIN EN 13813DIN 18560

KORODUR HB 5 rapid

Rapid-setting bonding agent for strong bond to substrate

Technical Data

Pull-off resistance≥ 1.5 N/mm²
Working timeapprox. 15 min
Overcoatable afterwet-on-wet

Standards & Certifications

DIN EN 1504-4

Ähnliches Projekt? Kontaktieren Sie unsere Berater.

Berater kontaktieren