
Warehouse & Logistics
Beach Chair Hall Sylt
2,200 m² fast & economical
Sylt, Germany2.200 m²
Challenges
- Restoration within a time window of only approx. 4 months after fire damage
- High demands on resistance to mechanical wear and weathering
- Strong bond to substrate using suitable bonding agent
- Economical application method (silo delivery / pumping technology)
Our Solution
Renovation with hard aggregate screed NEODUR HE 65. The wearing layer was installed on KORODUR HB 5 bonding agent using the KORODUR silo system with pumping and mixing technology, making the workflow extremely economical and sustainable.
Image Gallery
Benefits
Robust against use and weathering – long-lasting surface
Fast and efficient installation through silo technology
Secure, strong bond on hardened concrete substrate
Long-term operational safety and protection of beach chairs
Products Used
Technical data and standards of the KORODUR products used
NEODUR HE 65
Hard aggregate screed for indoor and outdoor use with silo technology
Technical Data
Compressive strength≥ 65 N/mm²
Abrasion resistanceA6 (≤ 6 cm³/50 cm²)
ApplicationSilo system / pump technology
Standards & Certifications
DIN EN 13813DIN 18560
KORODUR HB 5 rapid
Rapid-setting bonding agent for strong bond to substrate
Technical Data
Pull-off resistance≥ 1.5 N/mm²
Working timeapprox. 15 min
Overcoatable afterwet-on-wet
Standards & Certifications
DIN EN 1504-4
More References

Warehouse & Logistics
Orchard Farm Ibbenbüren
Floor with character – no downtime
Ibbenbüren, Germany
KORODUR FSCem ScreedNEODUR HE 60 rapid

Warehouse & Logistics
DHL Loading Bridges
Fast. Safe. Strong.
Ottendorf-Okrilla, Germany
Rapid Set CEMENT ALLRapid Set MORTAR MIX

Warehouse & Logistics
Joint Renovation Lyreco
Fewer steps – more performance
Schweiz, Switzerland|60 m Fugenlänge
Rapid Set MORTAR MIX
Ähnliches Projekt? Kontaktieren Sie unsere Berater.
Berater kontaktieren