
Industrial & Production
Kleemann Production Hall
Heavy load – quickly realised
Göppingen, Germany1.000 m²
Challenges
- High mechanical stress: heavy machinery and tracked vehicles
- Limited downtime – precise planning required
- Volume stability and low shrinkage required
- Strong bond to existing concrete substrate needed
Our Solution
NEODUR HE 60 rapid (15 mm) applied over special EP bonding agent. The floor was fully load-bearing after just 48 hours.
Image Gallery
Benefits
Drastically reduced downtime, quick usability in just 48 h
High abrasion resistance (≤ 5.0 cm³/50 cm²)
Volume-stable, low shrinkage – minimised crack formation
Products Used
Technical data and standards of the KORODUR products used
NEODUR HE 60 rapid
CT-C60-F8-A6Rapid-setting hard aggregate screed – fully load-bearing after 24 h
Schichtdicke: 10–60 mm
Technical Data
Compressive strength≥ 60 N/mm²
Flexural strength≥ 8 N/mm²
Abrasion resistanceA6 (≤ 6 cm³/50 cm²)
Walkable afterapprox. 4–6 h
Fully load-bearing afterapprox. 24 h
Standards & Certifications
DIN EN 13813DIN 18560DIN 18202 (Ebenheit)
More References

Industrial & Production
Weekend Renovation
Production Without Pause
Ebergassing, Austria|150 m²
NEODUR HE 60 rapidKORODUR HB 5 rapid

Industrial & Production
Monheim Production Area
Renovation between holidays
Monheim, Germany|400 m²
KOROCRETE SchnellbetonKORODUR HB 5 rapid

Industrial & Production
WEAG Waste Management
Fast, Robust, Durable – in 24 h
Deutschland, Germany|200 m²
NEODUR HE 60 rapidKORODUR HB 5 rapid
Ähnliches Projekt? Kontaktieren Sie unsere Berater.
Berater kontaktieren