Renovation of the production hall at Kleemann in Göppingen
Industrial & Production

Kleemann Production Hall

Heavy load – quickly realised

Göppingen, Germany1.000 m²

Challenges

  • High mechanical stress: heavy machinery and tracked vehicles
  • Limited downtime – precise planning required
  • Volume stability and low shrinkage required
  • Strong bond to existing concrete substrate needed

Our Solution

NEODUR HE 60 rapid (15 mm) applied over special EP bonding agent. The floor was fully load-bearing after just 48 hours.

Image Gallery

Benefits

Drastically reduced downtime, quick usability in just 48 h
High abrasion resistance (≤ 5.0 cm³/50 cm²)
Volume-stable, low shrinkage – minimised crack formation

Products Used

Technical data and standards of the KORODUR products used

NEODUR HE 60 rapid

CT-C60-F8-A6

Rapid-setting hard aggregate screed – fully load-bearing after 24 h

Schichtdicke: 10–60 mm

Technical Data

Compressive strength≥ 60 N/mm²
Flexural strength≥ 8 N/mm²
Abrasion resistanceA6 (≤ 6 cm³/50 cm²)
Walkable afterapprox. 4–6 h
Fully load-bearing afterapprox. 24 h

Standards & Certifications

DIN EN 13813DIN 18560DIN 18202 (Ebenheit)