Sinking block installation at a truck filling station in Spreewald
Infrastructure & Access

Sinking Blocks Quickly Installed

Trucks meet loose blocks

Spreewald, Germany

Challenges

  • Loose/displaced sinking blocks in truck fuelling area
  • Exact height level to liquid-tight concrete required
  • Short closure time, rapid trafficability

Our Solution

Blocks were removed, cleaned and re-set in a MORTAR MIX mortar bed, precisely aligned to the liquid-tight concrete.

Image Gallery

Benefits

Rapid recommissioning thanks to fast setting of MORTAR MIX
Precise level adjustment – clean connection to liquid-tight surfaces
Safe trafficability (blocks flush and grippy again)
Simple installation (just mix with water, conventional laying)

Products Used

Technical data and standards of the KORODUR products used

Rapid Set MORTAR MIX

Rapid mortar for joints, reprofiling and profile installation

Technical Data

Compressive strength (1 h)≥ 21 N/mm²
Compressive strength (24 h)≥ 42 N/mm²
Consistencypaste to plastic
Load-bearing afterapprox. 1–2 h

Standards & Certifications

ASTM C928DIN EN 1504-3